
WEIGHT: 60 kg
Breast: 36
One HOUR:70$
NIGHT: +50$
Services: Food Sex, Massage, Gangbang / Orgy, Sex anal, Games
Gresham, Smith and Partners provides design and consulting solutions for the built environment that contribute to the success of national and international clients. We have a tremendous responsibility and opportunity to directly impact people, our communities and our environment through our services. It is becoming increasingly important that we provide evidence of how our solutions are influencing positive social, economic and environmental change to help our clients achieve their goals.
Our annual Showcase program continues to challenge our project teams to tell a compelling story about their design and consulting solutions. The projects hit right at the root of our mission, to be the best consultant serving the built environment by focusing on the success of our clients. The projects featured in Showcase 9 illustrate how success is measured in a multitude of ways. I hope you are inspired by the projects detailed here and are proud of the many ways in which we continue to evolve in order to help our clients and communities thrive.
Showcase 9 serves as evidence of our collective success. Before photos show how the bridge had become structurally deficient after more than 50 years of service. Central portions of the original abutments were the only components to stay. This would involve removing the existing deck, beams and piers, and replacing them with a new single-span superstructure.
Reusing those in the new bridge configuration and replacing the existing superstructure presented the most cost-effective solution. Two precast units were fabricated adjacent to the bridge prior to the weekend.
The cross section shows how the two units were joined in the center with a mechanical connection filled with high-strength, fast-setting, non-shrink grout to form the superstructure. Plan sheet of the superstructure with both units installed. The two units are joined in the center with a mechanical connection filled with high-strength, fast setting non-shrink grout. It was ultimately decided that Accelerated Bridge Construction ABC โa process that dramatically reduces construction time as well as long-term inconvenience to motoristsโprovided the best solution.